Corporate Headquarters
4509 Guide Meridian
Bellingham, WA 98226
Phone: (360) 671-3936
Fax: (360) 671-8808
WA License No. IMCOGI*215R1

homespacerOther Projectsspacersafety and awardsspacernewsspacersubcontractorsspacercontact usspaceremployment

Featured Project

Airway Heights Water Reclamation Plant, Phase1B

Location: Airway Heights, WA
Owner: City of Airway Heights

Engineer:Century West Engineering Corporation
Completion Date: Summer 2011




Project Description:

Construction of a headworks building, final treatment building, dewatering building, a RAS/WAS pumping building, a 2.0 MG short term covered storage lagoon, a 0.02 MG storage tank, an influent pump station with approx. 14,600 LF of force main, misc. sitework and associated site piping. Completion of a laboratory and operations building, a 0.33 MG anaerobic treatment basin, a 0.5 MG anoxic treatment basin, a 1.5 MG aeration basin, a utility corridor and a 1.0 MG water storage reservoir that was constructed under a previous phase of work.

Featured Projects I Safety & Awards I News I Subcontractors I Contact Us I Employment
2008 Copyright Imco General Construction Inc. All rights reserved
Designed, Developed and Maintained by NW Technology