Featured Project

Arlington Wastewater Treatment Plant Upgrade and Expansion, Phase I

Location: Arlington, WA
Owner: City of Arlington

Engineer: Kennedy/Jenks Consultants
Completion Date: 2011

Project Description:

The project consists of improvements that will upgrade and expand the City of Arlington Wastewater Treatment Plant. The improvements include:

  • Relocation of utilities
  • New electrical, natural gas, and water services
  • Expansion of the existing headwork structure
  • Installation of new fine screens
  • Installation of new grit removal equipment
  • Conversion of existing Sequencing Batch Reactor (SBR) Tank No 2 into three continuous flow selector activated sludge aeration basins with aluminum covers
  • Construction of six new membrane bioreactor (MBR) tanks with structurally supported fabric covers and return activated sludge (RAS) wet wells with RAS pumps
  • Installation of MBR system.

Construction of a new BMR Support Building complete with MBR blowers, permeate pumps and chemical systems.

  • Modifications to the existing Secondary Support Building to improve ultraviolet (UV) disinfection
  • Upgrade the existing waste activated sludge (WAS) pumps
  • New polymer feed system
  • New digester blowers
  • New lime conveyance system
  • New sludge conveyors
  • Modifications to the mixer.