Everett: Replacement of Water Transmission Line 3 – Phase 7
Project Description:
The project replaces 3,800 linear feet of 48" diameter water transmission pipelines located along the south side of State Route 2. The City of Everett will turn the pipeline over to IMCO for construction no later than October 17, 2011. Replacement pipeline will be supported by pile bents located on 60’ spacing, consisting of two plumb 20” diameter steel piles extending approximately 120’ in depth and a steel cap beam. The project site is located almost entirely within lands designated by Snohomish County as critical area wetlands. Construction will include erosion control and restoration work.